December 2012
Spills data for December 2012
All download files are in PDF format and open in a new window.
Date Reported | Incident Site | JIV Date | Terrain | Cause | Estimated Spill Volume (bbl) | Clean-up Status | Comments | Photo | JIV Report * |
---|---|---|---|---|---|---|---|---|---|
07-Dec-12 | Otamiri Well 5L/S Flowline at Umuechem | 08-Dec-12 | Land | Sabotage/Theft | 3 | Recovery of spilled volume was completed on 8th December 2012. Initial cleanup of residual impacted area was completed on 2nd June 2013. | Site Certification was completed on 18th July 2013. | Download Photo | Download JIV Report |
07-Dec-12 | Bonny Terminal Crude Loading Platform at Bonny | 10-Dec-12 | Water | Operational | 20 | No recoverable oil was found on site. | Leak resulted from a failed hose. Active monitoring of the naturally dispersing sheen continues. Site Certification completed on 13th March 2013. | Download Photo | Download JIV Report |
07-Dec-12 | 8'' Ughelli West - UPS Delivery line at Ekakpamre | 11-Dec-12 | Land | Operational | 150 | Recovery of spilled volume was completed on 11th December 2012. | Initial cleanup of residual impacted area planned for completion in March 2013. | Download Photo | Download JIV Report |
08-Dec-12 | Ekulama 2 Well 38L Flowline at Freetown | 11-Dec-12 | Land | Operational | 9 | Recovery of spilled volume commenced on 13th December 2012 and was completed 17th December 2012. Initial cleanup of residual impacted area was completed on 18th April 2013. | Delay due to contracting issues. Site Certification planned for October 2013. | Download Photo | Download JIV Report |
11-Dec-12 | Umuechem Well 12L Flowline at Umuechem | 15-Dec-12 | Swamp |
Sabotage/Theft | 1 | No recoverable oil was found on site. Cleanup of residual impacted area was completed on 30th July 2013. | Site Certification was completed on 20th August 2013. | Download Photo | Download JIV Report |
12-Dec-12 | 4" Otamiri Well 8L Flowline at Umuechem | 15-Dec-12 | Land | Sabotage/Theft | 23 | Recovery of spilled volume commenced on 18th December 2012 and was completed 23rd December 2012. Initial Cleanup of residual impacted area was completed on 3rd July 2013. | JIV was completed on 17th December 2012. Site Certification was completed on 20th August 2013. | Download Photo | Download JIV Report |
17-Dec-12 | 6" Obigbo North - New Elelenwo Pipeline at Umusonya | 18-Dec-12 | Land | Sabotage/Theft | 721 | Recovery of spilled volume was completed on 22nd December 2012. Cleanup of residual impacted area was completed on 27th July 2013. | Site certification completed on 26th September 2013. | Download Photo | Download JIV Report |
17-Dec-12 | 28" Nkpoku -Bomu Pipeline at Kpoghor | 20-Dec-12 | Land | Sabotage/Theft | 4 | No recoverable oil was found on site. | Site certification completed on 20th March 2014. | Download Photo | Download JIV Report |
18-Dec-12 | 10" Ekulama 2 Pipeline at Sanbarth | 23-Dec-12 | Swamp | Operational | 13 | Recovery of spilled volume was completed on 27th December 2012. Initial cleanup of residual impacted area was completed on 18th April 2013. | JIV delayed due to construction of cofferdam to enable access to leak point. Site Certification was completed on 18th July 2013. | Download Photo | Download JIV Report |
20-Dec-12 | 8" Isimiri Pipeline at Obiakpu | 22-Dec-12 | Land | Sabotage/Theft | 312 | Recovery of spilled volume was completed on 27th December 2012. Initial cleanup of residual impacted area completed on 16th June 2013. | Site Certification was completed on 25th September 2013. | Download Photo | Download JIV Report |
26-Dec-12 | Nembe 1 Flow Line at Nembe Creek | 28-Dec-12 | Swamp | Operational | 16 | Recovery of spilled volume was completed on 27th December 2012. Initial cleanup of residual impacted area was completed on 4th April 2013. | Delays experienced due to protracted community contracting and difficult terrain. Site Certification was completed on 20th August 2013. | Download Photo | Download JIV Report |
31-Dec-12 | Cawthorne Channel 3 Well 41S Flowline at Cawthorne Channel | 2-Jan-13 | Swamp | Operational | 3 | Recovery of spilled volume was completed on 27th December 2012. Initial cleanup of residual impacted area was completed on 4th April 2013. | Schedule impacted by protracted community contracting and difficult terrain. Site Certification was completed on 11th July 2013. | Download Photo | Download JIV Report |